4* IHG Hotel close to Dublin Airport – D&B
Project Description: This development consists of a 10 storey 421-bedroom Hotel to InterContinental Hotel Group (IHG) Brand Standards. The Front of House, ground floor includes meeting and conference rooms, Gym, restaurant, bar and coffee dock / buffet area. Back of house includes Kitchen, cold storage, offices and associated staff facilities. Strategically located within 1km of…
Read MoreCentral Plaza
Project Description: The former Central Bank building was designed by award winning architect Sam Stephenson and opened in the late 1970’s to mixed reviews, it’s distinctive design has become one of Dublin city’s most striking buildings. Situated on a public plaza bound by Dame Street, Fownes Street Upper and Cope Street, the freestanding multi-bay 7…
Read MoreCarman’s Hall, Student Accommodation, Dublin 8
Project Description: This student accommodation scheme comprises of three residential buildings between five and six storeys, containing 207 high-specification en-suite bedrooms arranged in cluster apartments of between three to eight bedrooms. Based in the heart of Dublin city close to Trinity College, the property features communal areas, including a common room, cinema room, gym and…
Read MoreDublin Airport Central Phase 1 – D&B
This project known as “Dublin Airport Central Phase 1” (DAC1) included the design and build of 2 new, state of the art, commercial buildings and is central to the development of Ireland’s next generation business hub at Dublin Airport Central. Phase 1 of the Schiphol like “office city” involved the build of 20000m2 of Grade…
Read MoreBishop’s Square, Dublin 2 – Office Extension & Fit Out
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: Bishop’s Square office development is situated at the corner of Kevin Street Lower and Redmond Hill (R114) on a busy city centre thoroughfare. The project saw an existing 5 storey building expanded to include an additional 5154m2. This involved expanding the floorplates of the existing top two floors and…
Read MoreGRIFOLS Biopharmaceutical Facility – Grange Castle Business Park, Dublin – Phase 2
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: GRIFOLS negotiated phase 2 of this project with Stewart Construction due to the strong partnership approach adopted by the team – client, contractor and PM enabling contractor assisting design development during construction phase with minimum impact to programme. The newly built albumin purification and bag-filling plant adds more than…
Read MoreIrish Life Customer Service Centre, Dundalk
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: This project involved the construction of a new office block consisting of ground, first and second floors with a total gross internal floor area (GIFA) of 57,986 sq.ft. Ground floor consists of main reception, canteen, meeting rooms, office space, ground floor gym and associated changing rooms all surrounding an…
Read MoreGoethe-Institut
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: The redevelopment of the Goethe-Institut’s Irish Headquarters in Dublin city centre included the 1790 Georgian townhouse being refurbished to its period glory in addition to the creation of a new garden and contemporary mews building. The new building contains a new cultural/events space, a unique library and information…
Read More5 Harcourt Road
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: This live city centre project consisted of the demolition of the existing 8 storey office building within a very confined site and the construction of a 8 storey office building over one level of basement containing parking and ancillary facilities. The building achieved LEED Gold Status and B1 BER…
Read MoreFinch House, Dublin Airport Logistics Park
” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: The new 3330m2 Industrial Warehouse unit was completed for Rohan Group on their existing Dublin Airport Logistics Park campus. The unit comprises of a 2 storey office area with composite panel facade with feature aluminium panels and glazed curtain wall entrance area to the administration office. The site works included…
Read More