NYX Hotel, Portobello, Dublin 8 – D&B

NYX Hotel, Portobello

Project Description: Delivered on a design and build basis, this project involves the construction of a new 6 storey, 175 bedroom NYX Hotel overlooking the Grand Canal in the Portobello area on the south side of Dublin City, within 5 minutes walk of Camden Street and Iveagh Gardens.  The NYX Hotel, owned by Jurys Inn…

Read More

Hitech Health Facility Clean Rooms

Project Description: The design and build contract involves the design and construction of a new Gene and Therapeutics cleanroom manufacturing facility for Hi-Tech Health Laboratories, within an existing building, to required standards associated with G.M.P and manufacturing processes. Internal demolition along with removal of existing oil tank and upgrade of external glazing form part of…

Read More

ORACLE Fit Out

This project consisted of the refurbishment of two floor levels and the associated services located within the roof plant room and external roof of Block 2, Parkmore business Park, Galway with an approximate floor area of 1643m sq. Works included full open plan office refurbishments and the construction of offices, refurbishment of the reception area,…

Read More

4* IHG Hotel close to Dublin Airport – D&B

Holiday Inn Dublin Airport

Project Description: This development consists of a 10 storey 421-bedroom Hotel to InterContinental Hotel Group (IHG) Brand Standards. The Front of House, ground floor includes meeting and conference rooms, Gym, restaurant, bar and coffee dock / buffet area. Back of house includes Kitchen, cold storage, offices and associated staff facilities. Strategically located within 1km of…

Read More

Central Plaza

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: Refurbishment and fitout of the historic Central Bank HQ site. Designed and built in the 1970s, the building’s iconic exterior will remain largely preserved with the addition of a new, grand staircase entrance and an enhanced, open plaza space for the public to enjoy. Works include the upgrading and…

Read More

Dublin Airport Central Phase 1 – D&B

This project known as “Dublin Airport Central Phase 1” (DAC1) included the design and build of 2 new, state of the art, commercial buildings and is central to the development of Ireland’s next generation business hub at Dublin Airport Central. Phase 1 of the Schiphol like “office city” involved the build of 20000m2 of Grade…

Read More

Bishop’s Square, Dublin 2 – Office Extension & Fit Out

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: Bishop’s Square office development is situated at the corner of Kevin Street Lower and Redmond Hill (R114) on a busy city centre thoroughfare. The project saw an existing 5 storey building expanded to include an additional 5154m2.  This involved expanding the floorplates of the existing top two floors and…

Read More

Irish Life Customer Service Centre, Dundalk

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: This project involved the construction of a new office block consisting of ground, first and second floors with a total gross internal floor area (GIFA) of 57,986 sq.ft.    Ground floor consists of main reception, canteen, meeting rooms, office space, ground floor gym and associated changing rooms all surrounding an…

Read More

Gaelscoil Mhic Amhlaigh, Knocknacarra

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]Project Description: The project involved the construction of a new 24 classroom school with SET facility, a GP Hall, library / resource room, other ancillary accommodation and associated site works. The site works included soft and hard play areas, 3 nr ballcourts, foot and cycle paths, bicycle shelters, boundary treatments, pedestrian…

Read More

NDFA Devolved Schools Build Programme – Stewart Tracey JV D&B Bundle 2

” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″] Project Description: Design & Build of a bundle (“Bundle 2”) of primary and post primary schools on 4 different sites comprising a mix of new build, replacement, refurbishment and extensions. Schools include, North Kildare ETNS, Celbridge, Clane (Girls) NS, Kilcullen NS and Tullow Community School. Project Value: circa €16.1m Client:…

Read More