Project Description:
This project involved ground improvement, service installations and the casting of a 200mm deep concrete slab (11500m2), in a 24 week program. These works were completed adjacent to a Special Conservation Area and in an environmentally sensitive area. Surcharge material was placed and remained insitu for a 6 week settlement period, after which time it was removed to a designated stockpile area for re-use in the Dock expansion program
Project Value: €1.925m
Project Size: 200mm deep concrete slab (11500m2)
Client: Bus Eireann, 21 Phibsboro Road, Dublin 7.
Architect & Design Team: Architect: PM Group, Killakee House, Belgrade Square, Tallaght, Dublin; Engineer (Structural): PM Group, Killakee House, Belgrade Square, Tallaght, Dublin.
Reference Contact: PM Group, Killakee House, Belgrade Square, Tallaght, Dublin.
Project Duration: 6 months